Backing up an HVAC system.

A Pioneer FMCG Company in Dubai requested a chiller system as a backup for their HVAC system & process cooling to be starting within short notice due to life production concerns.G

There were chilled water connection challenges relating to current main header provision and
further modifications need to be done by Trane Rental Operations Team.

Supply & installation of piping and cabling containments required for maintaining factory
restrict safety standards.

SOLUTION:
RTAC300 x 1 No. along with centrifugal water pump 45L/S, Flexible chilled water piping,
Cabling and other system ancillaries. System supplied, installed, and started in 5 hours.